A tailboard conference – or job site planning meeting – is used to review the job plan, identify hazards and determine how to best mitigate these hazards before work begins. A job plan is typically prepared by a power line technician when the technician arrives at the job site in order to assess the work that needs to be carried out. Cause of death was determined to be electrocution.Īn investigation revealed that no job plan or tailboard was in place prior to the commencement of work. The worker in the bucket was taken to hospital and could not be revived. The supervisor was immediately called and both ambulance and the fire department were summoned. While the worker was heading to the truck cab to retrieve the rubber gloves, the truck shook and the boom of the bucket dropped. That worker called down to the other to bring rubber gloves from the cab of their truck. Up until that point, the worker in the aerial bucket had been working with leather gauntlet gloves and was preparing to make the final connection by fastening the neutral end to a connector that completes the circuit path. One worker was working from an aerial bucket while the other was working from the ground, and they began working on the downed primary neutral line. On October 31, 2012, the two workers cleared tree limbs and began to repair the electrical lines. The worker was one of two who had been assigned post-storm repair work on Passingham Drive in Sarnia, where trees had downed power lines. Bluewater Power Distribution Corporation, the utility providing electricity distribution and related services in the Sarnia-Lambton area, has been fined $120,000 in the 2012 death of a worker who was performing repair work following the aftermath of Hurricane Sandy.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |